Engineering Project Management Software, From Enquiry to Final Invoice

Project management for engineering consultancies and design firms, built around your own stages. An enquiry becomes a costed quotation, the purchase order raises the first invoice, drawings go through client revisions and authority approval, and the final invoice is raised when approval arrives. Each team sees what is waiting for them, and the client can check progress at any time.

Three construction workers wearing helmets and high-visibility vests reviewing blueprints and a laptop on a construction site.

The problem

A Project That Lives in Five Inboxes

The enquiry arrives by email. Costing is done in a spreadsheet that only one person understands, the quotation is a Word file with a revision number in its name, and the purchase order is somewhere in a thread. Drawings go back and forth with the client, and nobody counts the revisions until the fee has been spent.

Finance learns that authority approval has arrived when someone remembers to tell them, so the final invoice goes out late. When the client calls to ask where things stand, the answer takes three phone calls.

Three men in an office meeting room working on laptops and reviewing paper documents at a wooden table

How it works

Eight Stages, Each Owned by One Team

The stages below are set up for fire and life-safety design, where drawings need authority approval. Yours are set up to match your practice.

  1. Business development

    Enquiry

    Project, owner, architect, building type and an area statement floor by floor.

  2. Costing

    Quotation

    The fee is worked out from the area and building type, and adjusted where needed.

  3. Finance

    Quote check

    Finance approves the quotation or sends it back. Each approved version is saved as a PDF.

  4. Business development

    Purchase order

    The client’s order is uploaded, and the mobilization invoice is raised and emailed.

  5. Engineering

    Scope check

    Plot documents, coordinates and the site boundary are checked against the order.

  6. Engineering

    Drawings and revisions

    Marked-up drawings go to the client, round by round, until they are approved.

  7. Design engineers

    Authority approval

    Final drawings are submitted to the authority, and the approved set is uploaded.

  8. Finance

    Final invoice

    The final invoice is raised when approval is confirmed, and payment is recorded.

What it controls

Fees, Revisions and Invoices Under Control

  • Fees calculated, not guessed

    The quotation is costed from floor area, building type, engineer rates and your minimum fees. Any override is visible to finance.

  • Every quote revision kept

    Each approved version of the quotation is saved as a PDF with its revision number.

  • Invoices raised by the workflow

    The mobilization invoice follows the purchase order and the final invoice follows authority approval, each emailed as a PDF.

  • Revision rounds counted

    Each round of client comments has its own set of drawings. After a second rejection, finance must approve before more work is done.

  • The next team is told

    When a stage is approved or sent back, the team that owns the next stage gets an email with a link to the project.

  • Client status page

    The client enters the project reference on a public page and sees which stage the project has reached. No login is needed.

  • Site on the map

    Plot number, region, coordinates and the site boundary drawn on a map sit with the client’s documents.

  • Receivables dashboard

    Invoices awaiting payment and the value invoiced each month, from the same records.

  • Each team sees its part

    Costing figures are shown only to business development, costing and finance. Engineers see scope, documents and drawings.

Drawing office

A Drawing Register With Draftsman Hours

For teams that produce drawings in volume, each project carries a drawing register by discipline: civil, structural, electrical, plumbing, fire, HVAC and MEP coordination. Every drawing has estimated drafting hours, a planned submission date and an approval date worked out from the project’s lead time.

Draftsmen clock in and out on each drawing, so hours are known per drawing and per revision, and a draftsman can’t be clocked in on two drawings at once. A live project report shows every drawing with its revision, its logged hours and its status.

A woman with a tablet and two engineers in hard hats and high-visibility vests discussing plans on a laptop outdoors.

What changes

One Record per Project, From First Call to Last Payment

Email and spreadsheetsFieldmaster workflow
CostingEmail and spreadsheets

A spreadsheet one person maintains.

Fieldmaster workflow

Calculated from your rates and rules, with every override on record.

Where a project standsEmail and spreadsheets

Whoever handled it last knows.

Fieldmaster workflow

The current stage and its owner, visible to the team and to the client.

Drawing revisionsEmail and spreadsheets

Counted afterwards, if at all.

Fieldmaster workflow

Each round recorded, with finance approval once the limit is passed.

InvoicingEmail and spreadsheets

Raised when someone remembers.

Fieldmaster workflow

Raised by the workflow at the purchase order and at authority approval.

DocumentsEmail and spreadsheets

Spread across inboxes and shared folders.

Fieldmaster workflow

Client documents, quotations, drawings and approvals on the project record.

FAQ

Engineering Project Management Software: Common Questions

What is engineering project management software?

Software that carries an engineering or design project from the first enquiry to the last payment: the scope and fee, the drawings and their revisions, the approvals from the client and the authorities, and the invoices. For a consultancy, the value is in knowing which stage every project has reached, who holds it, and whether the work done is still covered by the fee.

Which kinds of consultancy is this for?

Any engineering, architecture or design practice whose projects follow a repeatable path from enquiry to approved deliverables: fire and life-safety, MEP, structural and civil design, and similar work. The stages, teams, fee rules and documents are set up to match how your practice runs.

Is it a scheduling tool with Gantt charts?

No. It does not draw Gantt charts or calculate a critical path, and it is not a CAD or BIM tool. It runs the stages, approvals, documents, drawing register, hours and invoices of each project. Firms that plan large construction programmes keep their scheduling tool for that.

How is the quotation calculated?

From figures you maintain yourself: rates per engineer type, time per square metre, weights per building type, minimum fees per phase and fixed costs such as site visits. The estimator enters the building and its areas, picks the phases in scope, and the fee is worked out. A price can be overridden, and the override stays visible.

Does it replace our accounting system?

No. It raises invoices, emails them as PDFs and records payments against each project, so you can see what is owed. Your accounts stay in your accounting system.

What happens when the client keeps asking for changes?

Each round of comments is recorded with its own drawings. Once the number of rounds you allow is passed, the project is routed to finance for approval before the engineers do more work.

Can clients see their project?

Yes. A public page shows the current stage for a project reference, without a login.

Can site visits be recorded too?

Yes. Supervision and inspection visits can be recorded on the phone in the Fieldmaster Pocket app, with photos and the GPS location, against the same project.

How long does it take to set up?

A typical app is live in 10 to 18 working days. We build it around your stages, fee rules and document templates.